Planning EPC projects phase by phase10
- 5.1 Engineering planning and control
- 5.2 Procurement planning, expediting and material control
- 5.3 Fabrication planning: spools, steel and modules
- 5.4 Construction planning and sequencing
- 5.5 Advanced Work Packaging
- 5.6 Mechanical completion, commissioning and handover
- 5.7 Shutdowns, turnarounds and brownfield work
- 5.8 Interface management
- 5.9 Look-ahead planning and short-interval control
- 5.10 Building an integrated EPC schedule: a worked example
The oil and gas industry11
- 17.1 How planning changes from one industry to another
- 17.2 Onshore cross-country pipelines
- 17.3 Offshore oil and gas: platforms, subsea, pipelay and hook-up
- 17.11 Pressure vessels, heat exchangers and storage tanks
- 17.15 Industry quick reference: rates, milestones and risks
- 17.16 In depth: onshore oil and gas EPC
- 17.17 In depth: offshore fixed platforms
- 17.18 In depth: subsea developments and FPSOs
- 17.19 In depth: cross-country pipelines
- 17.20 In depth: LNG projects
- 17.21 In depth: brownfield modifications and turnarounds
WBS templates and activity sequences8
- 19.1 Onshore oil and gas process plant (EPC)
- 19.2 Piping spool fabrication shop project
- 19.3 Onshore cross-country pipeline
- 19.4 Offshore fixed platform: jacket, topsides and hook-up
- 19.14 Storage tank farm
- 19.15 Pressure vessel and heat exchanger fabrication
- 19.17 Refinery or gas plant turnaround
- 19.20 Brownfield plant modification and tie-ins
Productivity norms6
- 20.1 Using norms: units, factors and calibration
- 20.6 Piping norms: shop and field
- 20.7 Mechanical equipment norms
- 20.8 Electrical and instrumentation norms
- 20.10 Pipelines, tanks and vessels: norms
- 20.13 Completions and commissioning norms
Know your field3
- 22.3 Piping for planners: from P&ID to test pack
- 22.4 Welding and NDT for planners
- 22.10 Commissioning in depth
Field notes: what goes wrong9
- 29.1 Field notes: onshore oil and gas EPC
- 29.2 Field notes: engineering phase
- 29.3 Field notes: procurement and vendors
- 29.4 Field notes: fabrication shops (spools, steel, vessels)
- 29.5 Field notes: piping and mechanical construction
- 29.6 Field notes: E&I, completions and commissioning
- 29.7 Field notes: pipelines
- 29.8 Field notes: offshore
- 29.9 Field notes: turnarounds and brownfield
How projects actually run4
- 30.1 How an onshore EPC project runs, from award to handover
- 30.2 How a cross-country pipeline project runs
- 30.4 How a plant turnaround is prepared and executed
- 30.7 How an offshore project runs: yard to first oil
Case studies11
- 23.1 Case: the gas plant that reported green
- 23.2 Case: piping productivity collapse and recovery
- 23.3 Case: pipeline spread and right-of-way access
- 23.4 Case: offshore topsides and the installation window
- 23.5 Case: the turnaround that overran
- 34.1 Case 1: record welding output, but the site had no workfront
- 34.2 Case 2: material release, not productivity, was driving the piping forecast
- 34.3 Case 3: erection at 70%, test packs at 25%
- 34.4 Case 4: a progress dispute over rules of credit
- 34.5 Case 5: preparing a fabrication facility for a client capacity assessment
- 34.6 Case 6: a monthly update that looked like good news
Schedule library22
- 25.3 Onshore gas processing plant EPC: Level 3 schedule
- 25.4 Engineering deliverables schedule: Level 4 with review cycles
- 25.5 Procurement schedule: fifteen packages from requisition to site
- 25.6 Piping spool fabrication shop schedule
- 25.7 Piping erection and test package schedule
- 25.8 Mechanical equipment installation: static and rotating
- 25.9 Electrical and instrumentation construction schedule
- 25.10 Pre-commissioning, commissioning and start-up by system
- 25.11 Storage tank farm (API 650 tanks)
- 25.12 Cross-country pipeline: spread schedule with ladder logic
- 25.13 HDD crossing and tie-ins
- 25.14 Offshore platform: detailed jacket and topsides schedule
- 25.15 Plant turnaround: hour-by-hour critical path
- 25.16 Brownfield revamp: SIMOPS, hot taps and a tie-in shutdown (detailed)
- 25.39 FPSO conversion: detailed schedule
- 25.49 Onshore well hook-up, flowlines and remote manifold
- 25.50 Subsea pipeline and riser installation
- 25.53 LNG liquefaction train
- 25.54 Full-containment LNG storage tank
- 25.55 Carbon capture and storage (capture, compression, pipeline, injection)
- 25.56 Ammonia plant (steam methane reforming)
- 25.58 Artificial island for offshore field development