All products
The Complete Guide · PDF

Planning & Project Controls: The Complete Guide

2,846 pages that cover the whole job, from CPM basics and Primavera P6 to earned value, contracts, forensic delay analysis, Power BI and AI.

Instant download · Secure checkout with Payhip · Single-user licence

2,846 pages529 chapters6 volumes19 industries
Cover of Planning & Project Controls: The Complete Guide
Look inside

See the real pages before you buy.

9 pages and screens from the product itself. Click any page to read it at full size.

What you get

In the download.

Every file, ready to use.

Volume 1

Foundations, scheduling and Primavera P6.

Volume 2

Progress, cost, risk, contracts and delay.

Volume 3

Industries and Primavera P6 in depth.

Volume 4

The schedule library: complete industry schedules with logic.

Volume 5

Advanced practice and reference.

Volume 6

AI and Power BI for planning engineers.

Contents

Everything that is inside.

The full table of contents, so you know exactly what you are buying.

Every chapter in the guide. Search the full contents with page numbers →

Volume 1: Foundations, Scheduling and Primavera P655

Preface

  1. P.1 Preface: why I wrote this book and how to use it

Foundations of planning and project controls

  1. 1.1 What planning and project controls are
  2. 1.2 The project lifecycle: FEL, FEED, EPC and stage gates
  3. 1.3 Contracting strategies and what they mean for planners
  4. 1.4 Standards, frameworks and bodies of knowledge

Scope, structure and estimating

  1. 2.1 Breakdown structures for EPC: WBS, CBS, OBS and coding
  2. 2.2 Schedule levels and the integrated project schedule
  3. 2.3 Estimating for planners: classes, quantities, norms and man-hours
  4. 2.4 Estimating durations
  5. 2.5 Documenting the schedule basis
  6. 2.6 Tender planning: bid schedules, execution strategy and pricing support

The CPM engine

  1. 3.1 The forward and backward pass
  2. 3.2 Total float and free float
  3. 3.3 Two definitions of critical
  4. 3.4 Retained Logic vs Progress Override
  5. 3.5 Calendars
  6. 3.6 Constraints
  7. 3.7 Other scheduling methods: line of balance, linear, critical chain and lean
  8. 3.8 Part 3 review: the scheduling engine
  9. 3.9 Resource levelling, smoothing and resource-constrained scheduling
  10. 3.10 Time–cost trade-off: crashing and fast-tracking

Primavera P6 in practice

  1. 4.1 Structure: EPS, WBS and activity codes
  2. 4.2 Relationships, leads and lags
  3. 4.3 Activity, duration and percent-complete types
  4. 4.4 Resource and cost loading
  5. 4.5 Baselines and archiving
  6. 4.6 The update cycle
  7. 4.7 The P6 power-user toolkit
  8. 4.8 Part 4 checkpoint: build and update a training schedule
  9. 4.9 P6 setup and administration: database, security, global data and preferences
  10. 4.10 Scheduling options and calendars in depth
  11. 4.11 Constraints, float and the critical path in P6
  12. 4.12 Updating in P6 step by step
  13. 4.13 Common P6 problems during execution and updating: diagnosis and fixes
  14. 4.14 Change control, revisions and baseline management in P6
  15. 4.15 Multi-project scheduling, contractor schedules and XER handling
  16. 4.16 Reporting from P6: layouts, printing, exports and visual tools
  17. 4.17 Other scheduling and schedule analysis tools
  18. 4.18 P6 interview questions and practical tests

Planning EPC projects phase by phase

  1. 5.1 Engineering planning and control
  2. 5.2 Procurement planning, expediting and material control
  3. 5.3 Fabrication planning: spools, steel and modules
  4. 5.4 Construction planning and sequencing
  5. 5.5 Advanced Work Packaging
  6. 5.6 Mechanical completion, commissioning and handover
  7. 5.7 Shutdowns, turnarounds and brownfield work
  8. 5.8 Interface management
  9. 5.9 Look-ahead planning and short-interval control
  10. 5.10 Building an integrated EPC schedule: a worked example

Schedule quality and assurance

  1. 6.1 DCMA 14-point assessment, part 1
  2. 6.2 DCMA 14-point assessment, part 2
  3. 6.3 GAO's ten best practices
  4. 6.4 Horizontal and vertical traceability
  5. 6.5 Writing a health-check report
  6. 6.6 Part 6 review: schedule quality
Volume 2: Progress, Cost, Risk, Contracts and Delay87

Progress measurement and performance

  1. 7.1 Rules of credit and progress measurement
  2. 7.2 Overall EPC progress: weighting engineering, procurement and construction
  3. 7.3 Earned value basics
  4. 7.4 Earned schedule
  5. 7.5 S-curves, asking rates and forecast credibility
  6. 7.6 Forecasting completion three ways
  7. 7.7 Manpower, productivity and labour planning
  8. 7.8 Part 7 review: progress, EV and forecasting

Cost control and integration

  1. 8.1 Cost control fundamentals: budgets, commitments, forecasts and contingency
  2. 8.2 Integrated cost and schedule control
  3. 8.3 Cash flow and financial forecasting
  4. 8.4 Change and trend management

Schedule risk analysis

  1. 9.1 Why schedules need risk analysis
  2. 9.2 Three-point estimates and distributions
  3. 9.3 Risk events
  4. 9.4 Running Monte Carlo
  5. 9.5 Risk drivers and contingency
  6. 9.6 Presenting risk results
  7. 9.7 Part 9 review: package the SRA
  8. 9.8 Reference class forecasting, optimism bias and the psychology of planning
  9. 9.9 Integrated cost and schedule risk analysis and contingency management

Reporting and communication

  1. 10.1 The progress report narrative
  2. 10.2 Visual reporting
  3. 10.3 Executive reporting
  4. 10.4 Stakeholder management
  5. 10.5 Dashboards and project controls KPIs
  6. 10.6 Planning workshops, facilitation and influence

Data, tools and automation

  1. 11.1 Inside the XER file
  2. 11.2 Exporting to Excel and reviewing data
  3. 11.3 Python basics for schedulers
  4. 11.4 Automated health check
  5. 11.5 Comparing updates automatically
  6. 11.6 Part 11 review: package your tools
  7. 11.7 Digital project controls: 4D/5D BIM, data platforms and AI

Contracts, notices and claims

  1. 12.1 FIDIC 2017 structure
  2. 12.2 Clause 8: programme, extension of time and delay damages
  3. 12.3 Clause 20: notices, claims and time bars
  4. 12.4 Clause 13: variations and their time effect
  5. 12.5 Disputes and the DAAB
  6. 12.6 Local law and enforceability
  7. 12.7 Other contract forms: NEC4, national oil company contracts and subcontracts
  8. 12.8 Writing and managing claims
  9. 12.9 Part 12 review: one event from start to finish

Delay analysis

  1. 13.1 Delay types
  2. 13.2 Cause and effect
  3. 13.3 Concurrency and pacing
  4. 13.4 Float ownership
  5. 13.5 The AACE RP 29R-03 taxonomy
  6. 13.6 Records and the SCL Protocol
  7. 13.7 Legal principles and landmark cases
  8. 13.8 Review: delay fundamentals
  9. 13.9 What a TIA is
  10. 13.10 Designing a fragnet
  11. 13.11 Preparing the base update
  12. 13.12 Running the TIA and reading the result
  13. 13.13 Concurrency, mitigation and acceleration in a TIA
  14. 13.14 Writing the TIA narrative
  15. 13.15 Review: stress-test the TIA
  16. 13.16 As-planned vs as-built
  17. 13.17 Impacted as-planned
  18. 13.18 Collapsed as-built
  19. 13.19 Windows analysis
  20. 13.20 Attributing delay in each window
  21. 13.21 Choosing and defending a method
  22. 13.22 Delay analysis in P6: hands-on techniques
  23. 13.23 A full forensic case study
  24. 13.24 Review: the windows analysis report
  25. 13.25 The expert witness: duties, reports and giving evidence

Disruption and quantum

  1. 14.1 Delay vs disruption
  2. 14.2 The measured mile
  3. 14.3 Other productivity methods
  4. 14.4 Prolongation costs
  5. 14.5 Head office overheads
  6. 14.6 Acceleration costs
  7. 14.7 Part 14 review: disruption and quantum

Strategic project controls

  1. 15.1 Recovery planning
  2. 15.2 Benchmarks and lessons learned
  3. 15.3 Owner's and PMC project controls
  4. 15.4 Portfolio and programme controls
  5. 15.5 Part 15 review: the executive brief

The planner's career

  1. 16.1 Assemble the portfolio
  2. 16.2 The CV
  3. 16.3 LinkedIn and visibility
  4. 16.4 Technical interview preparation
  5. 16.5 Case interview and presentation
  6. 16.6 Certifications and continuing professional development
  7. 16.7 Professional ethics for planners
Volume 3: Industries and Primavera P6 in Depth161

Planning across industries

  1. 17.1 How planning changes from one industry to another
  2. 17.2 Onshore cross-country pipelines
  3. 17.3 Offshore oil and gas: platforms, subsea, pipelay and hook-up
  4. 17.4 Power generation and renewables
  5. 17.5 Buildings, high-rise and fit-out
  6. 17.6 Roads and highways
  7. 17.7 Bridges, tunnels and marine works
  8. 17.8 Rail, metro and transit systems
  9. 17.9 Shipbuilding and new vessel construction
  10. 17.10 Ship repair, dry-docking and conversions
  11. 17.11 Pressure vessels, heat exchangers and storage tanks
  12. 17.12 Water, wastewater and desalination
  13. 17.13 Mining and mineral processing
  14. 17.14 Maintenance planning and operations
  15. 17.15 Industry quick reference: rates, milestones and risks
  16. 17.16 In depth: onshore oil and gas EPC
  17. 17.17 In depth: offshore fixed platforms
  18. 17.18 In depth: subsea developments and FPSOs
  19. 17.19 In depth: cross-country pipelines
  20. 17.20 In depth: LNG projects
  21. 17.21 In depth: brownfield modifications and turnarounds
  22. 17.22 In depth: combined-cycle and thermal power plants
  23. 17.23 In depth: solar, wind and battery storage
  24. 17.24 In depth: high-rise and complex buildings
  25. 17.25 In depth: roads and highways
  26. 17.26 In depth: bridges, tunnels and metro
  27. 17.27 In depth: ports, marine and dredging
  28. 17.28 In depth: water, wastewater and desalination
  29. 17.29 In depth: mining and mineral processing
  30. 17.30 In depth: shipbuilding and ship repair
  31. 17.31 In depth: data centres
  32. 17.32 In depth: pharmaceutical and life-science facilities
  33. 17.33 In depth: telecom networks
  34. 17.34 Comparing industries: what changes and what stays the same

Primavera P6 complete guide, screen by screen

  1. 18.1 Getting started: products, the database and the P6 window
  2. 18.2 Enterprise setup: EPS, OBS, users, security and Admin Preferences
  3. 18.3 Creating a project and setting Project Details
  4. 18.4 The WBS window: building and maintaining the WBS
  5. 18.5 Calendars in P6: global, project and resource
  6. 18.6 Activities: creating, editing and the Activity Details tabs
  7. 18.7 Activity codes and user-defined fields
  8. 18.8 Relationships: adding, editing and tracing logic
  9. 18.9 Constraints, expected finish and notebooks in practice
  10. 18.10 Scheduling: the Schedule dialog, options and the schedule log
  11. 18.11 Resources and roles: dictionary, assignments, units and curves
  12. 18.12 Costs: cost accounts, expenses, prices and budgets
  13. 18.13 Resource analysis and levelling in P6
  14. 18.14 Baselines in P6: maintaining, assigning and comparing
  15. 18.15 Layouts: columns, bars, group and sort, filters and timescale
  16. 18.16 Updating in P6 screen by screen
  17. 18.17 Earned value in P6
  18. 18.18 Global Change: bulk edits safely
  19. 18.19 Import and export: XER, XML, spreadsheets and Microsoft Project
  20. 18.20 Printing, reports and publishing
  21. 18.21 Claim Digger, schedule comparison and Check Schedule
  22. 18.22 Critical path workflows: longest path, float paths and near-critical analysis
  23. 18.23 Thresholds, issues, risks, documents and other project windows
  24. 18.24 P6 EPPM (web), Visualizer and team collaboration
  25. 18.25 Speed, shortcuts and working efficiently in P6
  26. 18.26 Scenario A: building a project from scratch, step by step
  27. 18.27 Scenario B: a monthly update with problems to solve
  28. 18.28 Scenario C: a time impact analysis in P6, step by step
  29. 18.29 Scenario D: recovery planning with what-if schedules
  30. 18.30 Scenario E: reviewing a contractor's XER submission
  31. 18.31 Activity steps, step templates and weighted progress
  32. 18.32 Roles, rates, resource shifts and assignment details
  33. 18.33 Investigating a schedule: twenty layouts that answer common questions
  34. 18.34 P6 troubleshooting gallery: fifteen cases with screens
  35. 18.35 Preparing P6 data for delay analysis and claims

WBS templates and activity sequences by industry

  1. 19.1 Onshore oil and gas process plant (EPC)
  2. 19.2 Piping spool fabrication shop project
  3. 19.3 Onshore cross-country pipeline
  4. 19.4 Offshore fixed platform: jacket, topsides and hook-up
  5. 19.5 Combined-cycle power plant
  6. 19.6 Utility-scale solar PV and battery storage
  7. 19.7 High-rise building
  8. 19.8 Road and highway
  9. 19.9 Bridge (segmental viaduct)
  10. 19.10 Bored tunnel and metro station
  11. 19.11 Rail and metro systems
  12. 19.12 Shipbuilding (new vessel)
  13. 19.13 Ship repair and dry-docking
  14. 19.14 Storage tank farm
  15. 19.15 Pressure vessel and heat exchanger fabrication
  16. 19.16 Desalination plant (reverse osmosis)
  17. 19.17 Refinery or gas plant turnaround
  18. 19.18 Substation and overhead transmission line
  19. 19.19 Mineral processing plant
  20. 19.20 Brownfield plant modification and tie-ins

Productivity norms and KPI reference

  1. 20.1 Using norms: units, factors and calibration
  2. 20.2 Engineering: deliverable hours and durations
  3. 20.3 Procurement lead times by equipment type
  4. 20.4 Civil and concrete norms
  5. 20.5 Structural steel norms
  6. 20.6 Piping norms: shop and field
  7. 20.7 Mechanical equipment norms
  8. 20.8 Electrical and instrumentation norms
  9. 20.9 Insulation, painting, fireproofing and scaffolding
  10. 20.10 Pipelines, tanks and vessels: norms
  11. 20.11 Buildings and infrastructure norms
  12. 20.12 Shipyard, ship repair and marine norms
  13. 20.13 Completions and commissioning norms
  14. 20.14 The KPI dictionary
  15. 20.15 KPIs by industry
  16. 20.16 Manpower ratios, densities and rules of thumb

Interview mastery

  1. 21.1 How planning interviews work and how to prepare
  2. 21.2 Question bank: CPM and scheduling fundamentals
  3. 21.3 Question bank: Primavera P6
  4. 21.4 Question bank: EPC planning, progress and earned value
  5. 21.5 Question bank: contracts, claims and delay analysis
  6. 21.6 Question bank: risk, reporting, leadership and data
  7. 21.7 Scenario and case questions with worked answers
  8. 21.8 Behavioural questions and model STAR answers
  9. 21.9 Practical test papers with solutions
  10. 21.10 Questions to ask, offers and the first 90 days in a new role
  11. 21.11 Question bank: industry-specific interviews
  12. 21.12 Question bank: advanced P6, data and forensic techniques
  13. 21.13 Question bank: planning lead and controls manager interviews

Know your field: the disciplines planners work with

  1. 22.1 Who does what on an EPC project
  2. 22.2 Engineering disciplines and their deliverables
  3. 22.3 Piping for planners: from P&ID to test pack
  4. 22.4 Welding and NDT for planners
  5. 22.5 QA/QC: inspection, test plans and records
  6. 22.6 HSE and permits to work
  7. 22.7 Materials management for planners
  8. 22.8 Document control, technical queries and change management
  9. 22.9 Construction methods, cranes and heavy lifts
  10. 22.10 Commissioning in depth
  11. 22.11 Procurement and commercial terms planners should know
  12. 22.12 Estimating basics for planners
  13. 22.13 Project management processes and governance
  14. 22.14 Site records and contract administration
  15. 22.15 Operations, handover and the operating phase
  16. 22.16 Planning in the Gulf: local practice and conditions

Case studies

  1. 23.1 Case: the gas plant that reported green
  2. 23.2 Case: piping productivity collapse and recovery
  3. 23.3 Case: pipeline spread and right-of-way access
  4. 23.4 Case: offshore topsides and the installation window
  5. 23.5 Case: the turnaround that overran
  6. 23.6 Case: metro systems integration slip
  7. 23.7 Case: high-rise façade delay and takt recovery
  8. 23.8 Case: dry-docking with major steel growth
  9. 23.9 Case: the contractor XER with hidden constraints
  10. 23.10 Case: an EOT claim under FIDIC from event to agreement
  11. 23.11 Case: the valve and the access (concurrency dispute)
  12. 23.12 Case: proving disruption with a measured mile
  13. 23.13 Case: crashing a power plant commissioning programme
  14. 23.14 Case: the risk analysis that moved FID
  15. 23.15 Case: setting up planning on a new project

Workbook: problems with full solutions

  1. 24.1 Workbook: CPM, float and critical path
  2. 24.2 Workbook: calendars, constraints and progress
  3. 24.3 Workbook: durations, norms and manpower
  4. 24.4 Workbook: progress and earned value
  5. 24.5 Workbook: forecasting, S-curves and asking rates
  6. 24.6 Workbook: crashing, levelling and line of balance
  7. 24.7 Workbook: risk, PERT and contingency
  8. 24.8 Workbook: delay analysis and concurrency
  9. 24.9 Workbook: disruption, quantum and cash
  10. 24.10 Workbook: mixed interview problems
  11. 24.11 Workbook: norms, estimating and resource loading
  12. 24.12 Workbook: P6 scenario problems
Volume 4: The Schedule Library58

Schedule library: complete industry schedules with logic

  1. 25.1 Relationship types, lags and logic patterns: the planner's field reference
  2. 25.2 How to read and use the schedule library
  3. 25.3 Onshore gas processing plant EPC: Level 3 schedule
  4. 25.4 Engineering deliverables schedule: Level 4 with review cycles
  5. 25.5 Procurement schedule: fifteen packages from requisition to site
  6. 25.6 Piping spool fabrication shop schedule
  7. 25.7 Piping erection and test package schedule
  8. 25.8 Mechanical equipment installation: static and rotating
  9. 25.9 Electrical and instrumentation construction schedule
  10. 25.10 Pre-commissioning, commissioning and start-up by system
  11. 25.11 Storage tank farm (API 650 tanks)
  12. 25.12 Cross-country pipeline: spread schedule with ladder logic
  13. 25.13 HDD crossing and tie-ins
  14. 25.14 Offshore platform: detailed jacket and topsides schedule
  15. 25.15 Plant turnaround: hour-by-hour critical path
  16. 25.16 Brownfield revamp: SIMOPS, hot taps and a tie-in shutdown (detailed)
  17. 25.17 Combined-cycle gas turbine (CCGT) power plant: detailed schedule
  18. 25.18 Utility-scale solar PV plant (200 MWp)
  19. 25.19 Onshore wind farm (16 turbines)
  20. 25.20 High-voltage substation (132/33 kV): detailed schedule
  21. 25.21 Overhead transmission line (100 towers)
  22. 25.22 High-rise residential tower (24 floors)
  23. 25.23 Villa compound (12 villas)
  24. 25.24 Hospital: MEP-intensive building
  25. 25.25 Steel-framed warehouse (pre-engineered building)
  26. 25.26 Data centre (8 MW IT): detailed schedule with five commissioning levels
  27. 25.27 Dual carriageway highway (18 km): detailed schedule
  28. 25.28 Highway bridge (6 spans, precast girders)
  29. 25.29 Bored tunnel with TBM (4 km): detailed schedule
  30. 25.30 Metro station (top-down cut and cover): detailed schedule
  31. 25.31 Railway track, OLE and signalling
  32. 25.32 Water treatment plant: detailed schedule
  33. 25.33 Sewer network with open cut and microtunnelling
  34. 25.34 Port quay wall and container berth
  35. 25.35 Dredging and land reclamation
  36. 25.36 Airport runway (4 km): detailed schedule
  37. 25.37 Shipbuilding: block construction to delivery
  38. 25.38 Dry-dock ship repair (in hours)
  39. 25.39 FPSO conversion: detailed schedule
  40. 25.40 Structural steel fabrication shop
  41. 25.41 Pressure vessel fabrication (ASME VIII)
  42. 25.42 Power station boiler outage (in hours): detailed schedule
  43. 25.43 Mining project: mine development and concentrator (detailed)
  44. 25.44 Telecom network rollout (96 sites)
  45. 25.45 Office fit-out (three floors)
  46. 25.46 Concrete gravity dam: detailed schedule by block and lift
  47. 25.47 Seawater reverse osmosis desalination plant: detailed schedule
  48. 25.48 Pharmaceutical sterile facility: detailed construction and qualification schedule
  49. 25.49 Onshore well hook-up, flowlines and remote manifold
  50. 25.50 Subsea pipeline and riser installation
  51. 25.51 FEED phase schedule
  52. 25.52 EPC tender (bid) schedule
  53. 25.53 LNG liquefaction train
  54. 25.54 Full-containment LNG storage tank
  55. 25.55 Carbon capture and storage (capture, compression, pipeline, injection)
  56. 25.56 Ammonia plant (steam methane reforming)
  57. 25.57 District cooling plant and network
  58. 25.58 Artificial island for offshore field development
Volume 5: Advanced Practice and Reference125

Advanced cost control and earned value

  1. 26.1 Cost control architecture: CBS, control accounts and work packages
  2. 26.2 From estimate to control budget: classes, basis of estimate and the performance baseline
  3. 26.3 Contingency: sizing, drawdown and governance
  4. 26.4 Commitments, accruals, incurred cost and VOWD
  5. 26.5 The monthly cost report: structure, reconciliation and narrative
  6. 26.6 Earned value management systems: ANSI-748 in practice
  7. 26.7 EV metrics at expert level: earned schedule, TCPI and independent EACs
  8. 26.8 Forecasting EAC bottom-up: quantities, productivity, rates and indirects
  9. 26.9 Change, trends and early warning: controlling scope growth
  10. 26.10 Indirect costs, time-related costs and prolongation
  11. 26.11 Cash flow, payment terms and working capital
  12. 26.12 Productivity and unit rate analysis for cost control
  13. 26.13 Cost control by contract type and by role
  14. 26.14 Cost in P6 and ERP integration (SAP, Oracle)
  15. 26.15 Common cost control mistakes, and how experienced controllers avoid them
  16. 26.16 Question bank: cost control and project controls interviews
  17. 26.17 Worked case: the month-12 cost and schedule report of an EPC project
  18. 26.18 Estimating methods for cost engineers and planners

Microsoft Project for planners

  1. 27.1 Microsoft Project and P6: where each fits and how the concepts map
  2. 27.2 Setting up MS Project correctly: the options that matter
  3. 27.3 Task types, effort-driven scheduling and the work formula
  4. 27.4 Logic, lags, constraints, deadlines and the critical path in MSP
  5. 27.5 Resources, assignments and levelling in MSP
  6. 27.6 Baselines, status date and updating in MSP
  7. 27.7 Earned value, custom fields and reporting in MSP
  8. 27.8 Moving schedules between MS Project and P6
  9. 27.9 Reviewing an MS Project schedule submission
  10. 27.10 MS Project mistakes, power tips and interview questions
  11. 27.11 Lab: build, update and review the same project in MS Project

Primavera P6 at expert level

  1. 28.1 How the P6 scheduler really works
  2. 28.2 Multiple float path analysis and longest path in depth
  3. 28.3 Out-of-sequence progress: retained logic, progress override and actual dates, worked example
  4. 28.4 Calendars at expert level: hours, mixed calendars and float distortion
  5. 28.5 Percent complete, units and earned value mechanics in P6
  6. 28.6 Global Change at expert level: formulas, conditions and safe use
  7. 28.7 Bulk updating with Excel, UDFs and indicators
  8. 28.8 The P6 database: tables, fields and SQL for analysis
  9. 28.9 XER files: anatomy and analysis with Python
  10. 28.10 Schedule health at expert level: beyond the DCMA checks
  11. 28.11 Recovery and acceleration modelling in P6
  12. 28.12 Large, multi-project and programme schedules in P6
  13. 28.13 Baseline management at expert level
  14. 28.14 Resource levelling at expert level
  15. 28.15 Schedule risk analysis from P6: QSRA workflow and tools
  16. 28.16 Twenty expert P6 puzzles with solutions
  17. 28.17 Expert P6 interview and practical test
  18. 28.18 Coding standards and a template library for P6
  19. 28.19 P6 EPPM: web features, portfolios and team collaboration
  20. 28.20 Resource-dependent activities, shifts and 24/7 work
  21. 28.21 Reporting automation from P6: Excel, Power BI and scripts
  22. 28.22 P6 administration settings an expert must know
  23. 28.23 Writing a P6 schedule specification for contractors
  24. 28.24 Building a baseline from scratch: the professional process
  25. 28.25 Lab 1: build and schedule a project from scratch
  26. 28.26 Lab 2: monthly update with out-of-sequence progress
  27. 28.27 Lab 3: time impact analysis with a fragnet
  28. 28.28 Lab 4: resource loading, levelling and earned value
  29. 28.29 Activity types in depth: behaviour, traps and correct use
  30. 28.30 Duration types in depth: Fixed Duration, Units, Units/Time with worked numbers
  31. 28.31 P6 for advanced work packaging (AWP)

Field notes: what goes wrong in each industry

  1. 29.1 Field notes: onshore oil and gas EPC
  2. 29.2 Field notes: engineering phase
  3. 29.3 Field notes: procurement and vendors
  4. 29.4 Field notes: fabrication shops (spools, steel, vessels)
  5. 29.5 Field notes: piping and mechanical construction
  6. 29.6 Field notes: E&I, completions and commissioning
  7. 29.7 Field notes: pipelines
  8. 29.8 Field notes: offshore
  9. 29.9 Field notes: turnarounds and brownfield
  10. 29.10 Field notes: power and renewables
  11. 29.11 Field notes: buildings and fit-out
  12. 29.12 Field notes: roads, bridges and infrastructure
  13. 29.13 Field notes: tunnels, metro and rail
  14. 29.14 Field notes: marine, ports and dredging
  15. 29.15 Field notes: shipbuilding and ship repair
  16. 29.16 Field notes: water, desalination and mining
  17. 29.17 Field notes: forty mistakes planners make, across all industries

How projects actually run: phase by phase

  1. 30.1 How an onshore EPC project runs, from award to handover
  2. 30.2 How a cross-country pipeline project runs
  3. 30.3 How a high-rise building project runs
  4. 30.4 How a plant turnaround is prepared and executed
  5. 30.5 How a shipyard new-build and a dry-docking run
  6. 30.6 How a power or renewable project runs
  7. 30.7 How an offshore project runs: yard to first oil
  8. 30.8 How the owner's and PMC planner works
  9. 30.9 A working week of a site planner
  10. 30.10 Model documents: narratives, notices and reports planners write

Situations: what an experienced planner does

  1. 31.1 Situations with managers and clients
  2. 31.2 Situations with progress, data and updates
  3. 31.3 Situations with delays, changes and claims
  4. 31.4 Situations in your career and team
  5. 31.5 Situations at the engineering and procurement interfaces
  6. 31.6 Situations in completions, commissioning and handover

Final exams and mock interviews

  1. 32.1 Final exam A: scheduling, Primavera P6 and MS Project
  2. 32.2 Final exam B: progress, cost control, risk, contracts and delay
  3. 32.3 Mock interviews: three full transcripts with model answers

Primavera P6 mastery: procedures, field dictionary and labs

  1. 33.1 P6 procedures: enterprise and project set-up
  2. 33.2 P6 procedures: WBS, activities, relationships and codes
  3. 33.3 P6 procedures: scheduling, baselines and updating
  4. 33.4 P6 procedures: resources, costs, earned value and levelling
  5. 33.5 P6 procedures: layouts, filters, groupings and reports
  6. 33.6 P6 procedures: import, export, Claim Digger, Global Change and admin checks
  7. 33.7 Field dictionary: dates, durations and float
  8. 33.8 Field dictionary: progress, units, costs and earned value
  9. 33.9 Field dictionary: relationships, codes, calendars and project fields
  10. 33.10 Lab 5: contemporaneous windows analysis across two updates
  11. 33.11 Lab 6: half-step (bifurcated) update
  12. 33.12 Lab 7: resource levelling by hand and in P6
  13. 33.13 Lab 8: earned value from a cost-loaded schedule
  14. 33.14 Lab 9: calendars and lag calendars
  15. 33.15 Lab 10: retained logic versus progress override, calculated
  16. 33.16 Lab 11: time impact analysis with concurrent delays
  17. 33.17 P6 procedures: delay analysis techniques step by step
  18. 33.18 P6 procedures: reviewing a contractor XER submission
  19. 33.19 P6 procedures: the complete monthly update, start to finish
  20. 33.20 P6 procedures: EPPM, Team Member progress and portfolio views
  21. 33.21 P6 procedures: risks, issues, thresholds and documents in P6
  22. 33.22 Field dictionary: resources, assignments and WBS fields
  23. 33.23 Twenty practice networks with full solutions

Case studies from piping and fabrication projects

  1. 34.1 Case 1: record welding output, but the site had no workfront
  2. 34.2 Case 2: material release, not productivity, was driving the piping forecast
  3. 34.3 Case 3: erection at 70%, test packs at 25%
  4. 34.4 Case 4: a progress dispute over rules of credit
  5. 34.5 Case 5: preparing a fabrication facility for a client capacity assessment
  6. 34.6 Case 6: a monthly update that looked like good news
Volume 6: AI and Power BI for Planning Engineers43

AI for planning engineers

  1. 35.1 AI for planning engineers: what it is, what it is not, and where it fits
  2. 35.2 The AI toolkit for planners: assistants, copilots and specialist scheduling tools
  3. 35.3 Prompting for planners: patterns, templates and a prompt library
  4. 35.4 AI with Primavera P6: getting data out, health checks, logic review and narratives
  5. 35.5 AI-assisted schedule development: WBS, activities, logic, durations and fragnets
  6. 35.6 AI for updating and progress: comparisons, progress capture and look-aheads
  7. 35.7 AI for dashboards and reporting
  8. 35.8 Forecasting with data, machine learning and AI
  9. 35.9 AI for risk and decision making
  10. 35.10 AI for delay analysis, contracts and claims
  11. 35.11 Building your own AI workflows: scripts, LLM APIs, agents and automation
  12. 35.12 Governance, data security, ethics and implementation
  13. 35.13 Hands-on guides: using ChatGPT, Claude, Microsoft Copilot and Excel AI step by step
  14. 35.14 AI on site: progress capture, computer vision, drones, 4D BIM and digital twins
  15. 35.15 Prompt library: sixty prompts for planning engineers
  16. 35.16 Case studies: AI on planning and project controls work
  17. 35.17 Part 35 workshop: an AI-assisted monthly update, end to end

Power BI for planning engineers: a complete course

  1. 36.1 Power BI for planners: what it is, how it fits, and how this book works
  2. 36.2 Getting planning data into Power BI: P6, Excel trackers, SharePoint and databases
  3. 36.3 Power Query I: cleaning and shaping planning data
  4. 36.4 Power Query II: M language, parameters, folders and update snapshots
  5. 36.5 Data modelling for project controls: star schema, relationships and the date table
  6. 36.6 DAX I: measures, calculated columns, filter context and CALCULATE
  7. 36.7 DAX II: time intelligence and S-curves
  8. 36.8 DAX III: earned value, KPIs, variance against last cut-off and working days
  9. 36.9 Designing planning dashboards that people use
  10. 36.10 Lab: building the planning and progress dashboard step by step
  11. 36.11 Publishing and sharing: the Power BI Service, refresh, gateways, apps and security
  12. 36.12 Performance, quality and best practice
  13. 36.13 AI inside Power BI: Copilot, Q&A, smart narratives and analytical visuals
  14. 36.14 Advanced techniques: parameters, calculation groups, what-if, paginated reports and Python
  15. 36.15 Multi-project and portfolio dashboards, and reporting straight from the P6 database
  16. 36.16 Power BI practice workbook: exercises with full solutions
  17. 36.17 Measure library for project controls dashboards
  18. 36.18 Case study: a piping and support commodity progress dashboard
  19. 36.19 Power BI course capstone: assessment, interview questions and quick reference

Appendices

  1. A.1 Glossary
  2. A.2 Formula sheet
  3. A.3 Checklists and templates
  4. A.4 Standards and reading list
  5. A.5 Templates library
  6. A.6 Quick reference cards
  7. A.7 The planner’s library: an annotated guide to independent books and standards
Who it is for

Made for working planners.

Save 30%

Also in the Complete Bundle

The Complete Guide comes with the book, the schedule library, the trackers, the Power BI kit and the interview bank for $129 instead of $185.

See the bundle →
Questions

Before you buy.

What format is it?

Digital files: PDF guides, and Excel, Word or PowerPoint files where the product includes them. You get a download link straight after checkout, and by email.

Can I use it at work?

Yes. The single-user licence covers your own work, including on your employer's and your clients' projects. For a team licence, contact us through the Payhip store.

Which software do I need?

A PDF reader for the guides. Excel, Word or PowerPoint (or compatible software) for the templates. Primavera P6 or Microsoft Project for schedule files.

Is the sample data real?

No. All sample projects, names, dates and figures are fictitious and are there to show how each file works.

You may also need

Related products.

Bundle

The Complete Bundle

The Complete Guide and the five core tools in one download: the book, P6 schedule library, Excel trackers, Power BI kit and interview bank.

$129Look inside →
Industry packNew

Oil & Gas Planning Pack

Every oil and gas chapter of the Complete Guide in one 498-page PDF, with 22 ready-to-import P6 schedules and the piping trackers.

$45Look inside →
ToolNew

P6 Cheat Sheets

Ten one-page references to keep beside your keyboard: CPM, P6 settings, updating, baselines, resources and earned value.

$15Look inside →
The Complete Guide

Ready when you are.

$69 The Complete GuideBuy now